Project Description

A clean open warehouse space with extra-large bays, 24-foot high clear span metal trusses, a TPO roof, ESFR fire suppression system, and rear grade level loading docks. The building also includes a polished storefront entrance and low maintenance landscaping. HC Company constructed the facility to include under-slab utilities for up to four future tenant improvements. The floor is specially designed for heavy loads with 7 inches of reinforced concrete.

Category: Industrial

“Working with HC Company has been a pleasing experience to say the least. We have done several projects across the western states and I have never been more pleased. We managed the entire project remotely, they performed timely and delivered under budget. From design to to our final walk through everything was done professionally and efficiently. I have enjoyed working with them on every step of the projects we have completed and I look forward to working with them on our future developments.”

Eric Ivie Mountain Life Ventures
PROJECTS

PROJECTS

Latest Projects.

VIEW ALL PROJECTS
Advanced Sign Industrial, Retail
Greyloch Custom Cabinetry High Tech, Industrial
Cambridge Fire Station Industrial
KM Engineering Industrial
Victory Park Buildings Industrial
CONNECT

CONNECT

Let’s Talk About Your Next Project.

As our company continues to grow, we invite you to be a part of the adventure!

Contact Us