July 10, 2023

Project Complete: Braniff Demo and Tennant Improvement in South Boise

Demo: The project involved selective demolition, encompassing the removal of existing equipment within the 65,000 sf building, including gantry cranes, rails/tracks, lathe, and CNC machine. Throughout this process, the existing metal building structure was preserved. Addition: The construction phase included the addition of a 6,800 sf steel structure building on the south side of the […]

Kimberlee Sanborn

Demo: The project involved selective demolition, encompassing the removal of existing equipment within the 65,000 sf building, including gantry cranes, rails/tracks, lathe, and CNC machine. Throughout this process, the existing metal building structure was preserved.

Addition: The construction phase included the addition of a 6,800 sf steel structure building on the south side of the existing metal building. Additionally, a new wall has been installed to create two separate leasable areas within the existing building.

Owner: Bespoke Holdings Company    General Contractor: HC Company     Architect: Schlicter Ugrin Architecture    Engineering: KM Engineering and King Mechanical